Compare the time saving difference of using The footing Tube versus using traditional methods! |
| The Footing Tube | Traditional Methods |
| 4 steps | 12 steps |
|
The Footing
Tube TOOLS REQUIRED MATERIALS PROCEDURE 1 - Excavate 2 - Install 3 - Backfill 4 - Fill COORDINATIONS - (The Footing Tube) Excavation & Backfill - Can be done moments apart with same machine, no wasted time. Compaction of backfill can be done prior to filling tube with concrete. Weather conditions - Wet conditions will not stop installation. Materials required - Just one product to remember to bring. Exact amount of concrete needed is labeled on each tube. Backfill material - Existing ground can be used to backfill The Footing Tube. The plastic tapered form eliminates frost from bonding to concrete pier. No need to fill The Footing Tube with concrete before backfilling. Pouring of concrete - Does not have to be done right away. Many tubes can be installed at different times and poured at your convenience. |
Common Method TOOLS REQUIRED MATERIALS PROCEDURE 1 - Excavate 2 - Install 3 - Cut 4 - Connect 5 - Brace 6 - Backfill 7 - Fill 8 - Install 9 - Wait 10 - Strip 11 - Wrap 12 - Backfill COORDINATIONS Excavation & Backfill - Backfilling of the construction tube prior to pouring of concrete may weaken the tube due to soil water content. Concrete should be poured prior to backfill, construction tube removed and slip joint installed prior to backfilling of pier. Weather conditions - It is recommended that a construction tube remain dry to keep its form and strength prior to pouring of concrete. Rainy damp weather makes timing of your job more dependent on the weather. Materials required - Remembering all the components required to complete the installation. Can materials be picked up at one supplier? Waste of excess materials. If one or more of the materials are not installed, will the system fail? Backfill material - Clean material may need to be used as backfill to further reduce the risk of frost bonding to pier. Drainage away from the base of the pier may also be required to reduce water around pier. Crushed rock and drain tile may be needed. Pouring of concrete - Concrete should be poured right away due to weather and ground water. Calculation of amount of concrete required. Time required for concrete to cure before stripping form and backfilling. |
Technical
Specifications
Testimonials
Installation
Available
at..
Contact Us
FAQ
Home
©2001 The Footing Tube - U.S. Patent #6,318,700 - Canadian Patent #2,179,701